FY 2006-2007 Transportation Maintenance Operations Projects

Press Enter to show all options, press Tab go to next option
  1. School Markings Upgrades
  2. Thermoplastic Upgrades
  3. Traffic Signal Head Change Outs: From July 2006 – October 2006, all 8” traffic signal heads will be changed to 12” for enhanced traffic signal visibility.
  4. White and Yellow Long Line Painting
  5. Traffic Safety Projects: Radar Speed Feedback Signs; Smart Crosswalks; High Intensity Reflective Signs for Enhanced Visibility